At a Glance
 
Central Software
CityVoD - CSC Forum Archive
Software List on CSC Student LAN

Location and Floor Plan of the CSC Teaching Studio Areas
Opening Hours of the CSC
Systems Maintenance Schedule
List of Blocked Network Cards / IP Addresses
List of CSC Representatives
List of Departmental Network Administrators
Staff Computer Courses
Sitemap
 
CSC e-Forms
 
Submit CSC Work Req.
Req. for Printing
Req. for Dump / Restore
Teaching Studio Booking / Cancellation
Email Alias Application
Apply for a New Domain Name
Remove an Existing Domain Name
Modify the Hosting of an Existing Domain Name
 
Useful Links
 
OCIO Home
IT Information for Students
IT Information for Staff
IT Information for Alumni
 
Got any questions, comments or suggestions? Contact the editors at ccnetcom@cityu.edu.hk
Issue 28 - June 2001
Tender for Network Upgrade Approved
By C. Y. Kwok

Recently, tenders have been invited for a total network upgrade solution which includes a comprehensive network upgrade plan, plus the supply, installation, testing and commissioning of all the networking hardware and software required for the upgrade. After careful consideration, the tender finally went to the PCCW with the employment of Cisco products. Within the next 6 to 36 months, the CityU campus network will undergo a tremendous upgrade and soon all end users will be able to enjoy a new advanced network with high performance, resilience, flexibility and scalability.

The network upgrade is targeted to replace the existing ATM network switches (both at the core and the edge), and to merge the 2 backbones into a single new one which will deploy various state-of-the-art network technologies such as gigabit networking, multiplayer switching, end-to-end QoS (quality of service), traffic policing, and IP multicast support. We expect the new network will not only have sufficient capacity to meet the network bandwidth requirements of all users for at least the next 5 years, but also feature high performance, availability, reliability, and manageability. Furthermore, the upgrade will provide 10/100 Mbps desktop connectivity for over 4,000 computer systems as well as multiple Gigabit Ethernet uplinks for each of the 60+ wiring closets.

The network upgrade consists of the following 3 phases:

  1. Phase I has already commenced and will last for 6 months.

  2. Phase II will commence some time after 1 July 2001 and should be completed before 30 June 2002. This phase will overlap with Phase I.

  3. Phase III will commence on 1 July 2002 and last for 6 months.

In Phase 1, the following areas will be covered:

  • Setting up a new network core consisting of a pair of layer-3 Gigabit switches

  • Setting up a server farm consisting of a pair of layer-2/3 Gigabit switches to which all the central hosts and servers will be connected

  • Setting up 2 groups of distribution layer switches which will route IP traffic between the access layer switches and the core

  • Upgrading the access layer switches currently supporting the network connections of the majority of academic departments

Around 2,500 network ports will be upgraded to 10/100 Mbps during this phase.

 

Also in this issue...
Personnel Information at Your Fingertips
Booking of University Venues on the Web

The In-house High-Performance Computer

Improved Storage Management for Central Servers
Security Uplift for the Express Terminals
The Intellectual Property (Miscellaneous Amendments) Ordinance 2000
Compatibility Between Different Versions of MS Word

 

 

Current & Back Issues
 
 
Search Articles
 
 
FAQs
 
Microsoft Windows10
Microsoft Windows 7
Office 365 ProPlus
Microsoft Office 2013
Microsoft Office 2010
中文支援常見問題
Internet Explorer 11
Internet Explorer 9
Email Services
Confidential Email
Wireless LAN
Virtual Desktop Service (VDS)
USB Flash Drive
Mirroring360
CityU SMS (for Department)
CityU SMS (for Staff & Student)
iPad (iOS 5.x)
Wiping a Mobile Device
Wiping Mass Storage Device
Handling Handheld Smart Devices for Service Maintenance, Recycling Use, and Disposal
Staff Account Renewal
Changing Local Administrator Password
McAfee Endpoint Security
Full Scan of Your Computer for Concealed Computer Virus
Anti-spyware
Computer Warranty Scheme Software Copyright Declaration and Compliance Observation
 
Technical Guides
 
AV Facilities User Guide
Connecting to Wireless LAN (WiFi)
VPN Connection Setup Guide BitLocker To Go User Guide
 
Copyright© Computing Services Centre, City University of Hong Kong. Best viewed in 1024x768 with IE. Javascript enabled. Last modified on Friday December 28 2018 .