Site menu:

Dr. FUNG, Y.K., Richard

Photo of Dr. FUNG

Associate Professor


BSc-ProdE(Aston), MPhil(Aston), PhD(Loughborough), CEng(UK), MIEE(UK), MHKIE, CFPIM, MISMHK

Email: meykfung@cityu.edu.hk

Research Areas: Logistics Systems, Market-focused Operations


Education

Date Title Discipline Name of Institution
1976 Higher Diploma Production Engineering Hong Kong Polytechnic, HK
1978 B.Sc. (Hons) Production Engineering University of Aston, UK
1983 M.Phil. Manufacturing Resource Planning University of Aston, UK
1997 Ph.D. Customer Requirements Management Loughborough University, UK

Research interests


Honours / Awards


Internal Committee


External Committee


Membership

Member Institution of Production Engineers, UK (M.I.Prod.E.)
Member Institution of Electrical Engineers, UK (M.I.E.E.)
Chartered Engineer Engineering Council, UK (C.Eng.)
Member The Hong Kong Institution of Engineers (MHKIE)
Fellow, CFPIM Certified Fellow in Production and Inventory Management
American Production and Inventory Control Society (APICS)
Member Institute for Supply Management (ISM), USA
Council Member Institute for Supply Management (Hong Kong Chapter)
External Supervisor HKIE Graduate Training Scheme A for Nypro Tool (HK) Ltd.
Assessor HKIE, Professional Assessment Panel for Corporate / Associate
Membership, Manufacturing & Industrial Engineering Discipline
Assessor IEE(UK), Professional Assessment Panel for Corporate / Associate
Membership, Manufacturing & Industrial Engineering Discipline
Member Hong Kong Professional Teachers' Union
Elected CityU Representative Executive Council, Hong Kong Professional Teachers' Union

Working Experience

1989-Present City University of Hong Kong -- Senior Lecturer /Associate Professor
1986-89 Handley Walker Group Plc., UK. -- Senior Consultant
1982-86 Production Engg. Research Association, PERA, UK -- Senior Engineer
1980-82 Bentley Textile Machinery Limited, UK -- Project Engineer
1978-80 Ferranti Limited, UK -- Production Engineer

Selected Journal Publications since 2000

  1. Tang, J., Fung, R.Y.K. and Yung, K. L., "Fuzzy Modelling and Simulation for Aggregate Production Planning", International Journal of Systems Sciences (Accepted for Publication).


  2. Wang, D.W., Fung, R.Y.K. and Ip, W.H., "An immune-genetic algorithm for introduction planning of new products", Computers & Industrial Engineering , Vol. 56, No. 3, April, 2009, pp. 902-917.


  3. Tang, J., Pan, Z., Fung, R.Y.K. and Lau, H.C.W., "Vehicle routing problem with fuzzy time windows", Fuzzy Sets and Systems , Vol. 160, No. 5, March, 2009, pp. 683-695. (Project Number: 7002078)


  4. Liu, Huiran, Jiang, Z.B. and Fung, R.Y.K., "Performance modeling, real-time dispatching and simulation of wafer fabrication systems using timed extended object-oriented Petri nets", Computers & Industrial Engineering , Vol. 56, No. 1, February, 2009, pp. 121-137. (Project Number: 7001716)


  5. Pan, Z., Tang, J. and Fung, R.Y.K., "Synchronization of Inventory and Transportation under Flexible Vehicle Constraint: A Heuristics Approach Using Sliding Windows and Hierarchical Tree Structure", European Journal of Operational Research , Vol. 192, No. 3, February, 2009, pp. 824-836. (Project Number: 7002078)


  6. Tang, J., Liu, Y. and Fung, R.Y.K., "Industrial Waste Recycling Strategies Optimization Problem: Mixed Integer Programming Model and Heuristics", Engineering Optimization , Vol. 40, No. 12, December 2008, pp. 1085-1110. (Project Number: 7002020)


  7. Liang, F., Jiang, Z.B. and Fung, R.Y.K., "Job Shop Scheduling Based on Evolving Cellular Automata with Genetic Algorithm", International Journal of Agile Manufacturing , Vol. 10, No. 3, 2008, pp. 8 - 16.


  8. Fung, R.Y.K., Chen, T., Sun, X. and Tu, Y.L., "An Agent-based Infrastructure for Virtual Enterprises using Web-Services Standards", International Journal of Advanced Manufacturing Technology , Vol. 39, 2008, pp. 612-622. (Project Number: 7001716)


  9. Ho, G.T.S., Lau, H.C.W., Chung, S.H., Fung, R.Y.K., Chan, T.M. and Lee, C.K.M., "Fuzzy Rule Sets for Enhancing Quality in a Supply Chain Network ", Industrial Management & Data Systems , Vol. 108, No. 7, 2008, pp. 947-972.


  10. Liang, F., Fung, R.Y.K., Jiang, Z.B. and Wong T.N., "A Hybrid Control Architecture and Coordination Mechanism in Virtual Manufacturing Enterprise", International Journal of Production Research, Vol. 46, No. 13, July 2008, pp. 3641-3663. (Project Number: 7001863)


  11. Fung, R.Y.K., Chen, Y. and Tang, J., "A quality engineering-based approach for conceptual product design", International Journal of Advanced Manufacturing Technology, UK, Vol. 32, No. 11-12, May 2007, pp 1064-1073.


  12. Tu, Y. L., Xie, S. Q. and Fung, R.Y.K., "Product Development Cost Estimation in Mass Customization", IEEE Transactions on Engineering Management, Vol. 54 , No. 1 , February, 2007, pp. 29-40.


  13. Fung, R.Y.K. and Chong, S.P.Y., "An active styling platform for designing and developing product families", Journal of Intelligent Manufacturing, Vol. 18, No. 1, April, 2007, pp. 47-58.


  14. Ng, P. and Fung, R.Y.K., "Applying Formal Concept Analysis in Requirements Validation with UML State Machine Model", International Journal of Computer & Information Science, Vol. 8, No. 4, December, 2007, pp. 550-559.


  15. Liu, Huiran, Jiang, Z.B. and Fung, R.Y.K., "The infrastructure of the timed EOPNs-based multiple-objective real-time scheduling system for 300mm wafer FAB", International Journal of Production Research, Vol. 45, No. 21, 2007, pp. 5017-5056.


  16. Wong, T.N., Leung, C.W., Mak, K.L. and Fung, R.Y.K., "Dynamic shopfloor scheduling in multi-agent manufacturing systems", Expert Systems With Applications, Vol. 31, No. 3, 2006, pp. 486-494.


  17. Chen, Y., Fung, R.Y.K. and Tang, J., "Rating technical attributes in fuzzy QFD by integrating fuzzy weighted average method and fuzzy expected value operator", European Journal of Operational Research, Vol. 174, No. 3, Nov. 2006, pp. 1553-1566.


  18. Fung, R.Y.K., Liu, L. and Liu, Z., "A New LCA Approach Using a Fuzzy Decision-making Methodology", International Journal of Electronic Business Management, Vol. 4, No. 4, 2006, pp. 332-340.


  19. Cheng, W., Fung, R.Y.K., Gong, D.C. and Zhao, Z.B., "A Case Study on Green Product Design and Supplier Chain Management of Taiwan 3C Electronic Industry", International Journal of Electronic Business Management, Vol. 4, No. 4, 2006, pp. 272-284.


  20. Liang, F., Jiang, Z.B., Fung, R.Y.K., Tao, L. and Ma, M., "Rapid configuration of job shop production control system based on soft components technology", International Journal of Advanced Manufacturing Technology, Vol. 30, No. 11-12, Oct., 2006, pp. 1154-1164.


  21. Wong, T.N., Leung, C.W., Mak, K.L. and Fung, R.Y.K., "An agent-based negotiation approach to integrate process planning and scheduling", International Journal of Production Research, UK, Vol. 44, No.7, Apr 2006, pp 1331-1351.


  22. Fung, R.Y.K., Chen, Y. and Tang, J., "Estimating the functional relationships for quality function deployment under uncertainties", Fuzzy Sets and Systems, UK, Vol.157, No.1, Jan 2006, pp 98-120.


  23. Wong, T.N., Leung, C.W., Mak, K.L. and Fung, R.Y.K., "Integrated Process Planning and Scheduling/Rescheduling with an agent-based approach", International Journal of Production Research, UK, Vol.44, No.18-19, Oct 2006, pp 3627-3655.


  24. Liu, H., Jiang, Z.B. and Fung, R.Y.K., "Modeling of Large-Scale Complex Re-entrant Manufacturing Systems by Extended Object-oriented Petri Nets", International Journal of Advanced Manufacturing Technology, UK, Vol.27, No.1-2, Jan 2006, pp 190-204.


  25. Fung, R.Y.K., Chen, Y., Chen, L. and Tang, J., "A fuzzy expected value-based goal programming model for product planning using quality function deployment", Engineering Optimization, UK, Vol.37, No.6, Sep 2005, pp 633-647.


  26. Fung, R.Y.K. and Chen, T., "A Multi-Agent Supply Chain Planning and Coordination Architecture", International Journal of Advanced Manufacturing Technology, UK, Vol.25, No.1, Jun 2005, pp 811-819.


  27. Lau, H.C.W., Lau, P.K.H., Fung, R.Y.K., Chan, F.T.S. and Ip, R.W.L., "A Virtual Case Benchmarking Scheme for Vendors Performance Assessment", Benchmarking: An International Journal, UK, Vol.12, No.1, Jul 2005, pp 61-80.


  28. Chen, Y., Fung, R.Y.K. and Tang, J., "Fuzzy expected value modeling approach for determining target values of engineering characteristics in QFD", International Journal of Production Research, UK, Vol.43, No.17, Aug 2005, pp 3583-3604.


  29. Liu, H., Fung, R.Y.K. and Jiang, Z.B., "Modelling of Semiconductor Wafer Fabrication Systems by Extended Object-Oriented Petri Nets", International Journal of Production Research, UK, Vol.43, No.3, Aug 2005, pp 471-495.


  30. Wan, F., Wang, D. and Fung, R.Y.K., "New Product Introduction Planning using a 0-1 Semi-Infinite Programming Model", Production Planning and Control, UK, Vol.16, No.1, May 2005, pp 12-20.


  31. Wong, G.Y.F. and Fung, R.Y.K., "Technological Innovativeness and Organizational Culture in Hong Kong", Contemporary Management Research, Taiwan, Vol.1, No.1, Jul 2005, pp 35-56.


  32. Fung, R.Y.K., Chong, S.P.Y. and Wang Y., "A Framework of Product Styling Platform Approach: Styling as Intangible Modules", Concurrent Engineering: Research and Applications, UK, Vol.12, No.2, May 2004, pp 89-103.


  33. Wang, W., Fung, R.Y.K. and Chai, Y., "An Approach of JIT Distribution Requirements Planning for Supply Chain", International Journal of Production Economics, UK, Vol.91, No.2, Jul 2004, pp 101-107.


  34. Lau, H.C.W., Chan, F.T.S., Fung, R.Y.K. and Wong C., "An XML-Based Real Time Quality Measurement Scheme", Industrial Management & Data Systems, UK, Vol.104, No.6, Jun 2004, pp 505-512.


  35. Lee, C., Lau, H.C.W., Yu, K.M. and Fung, R.Y.K., "International Journal of Production Economics", Development of a Dynamic Data Interchange Scheme to Support Product Design in Agile Manufacturing, UK, Vol.87, Apr 2004, pp 295-308.


  36. Chen, Y., Tang, J., Fung, R.Y.K. and Ren, Z., "International Journal of Production Research", Fuzzy Regression-Based Mathematical Programming Model for Quality Function Deployment, UK, Vol.42, No.5, Mar 2004, pp 1009-1027.


  37. Lau, H.C.W., Choy, K.L., Wong, C. and Fung, R.Y.K., "A Generic Management Information System for Small and Medium Enterprises", International Journal of Manufacturing Technology and Management, UK, Vol.5, No.1/2, Aug 2003, pp 162-176.


  38. Jiang, Z.B. and Fung R.Y.K., "An Adaptive Agile Manufacturing Control Infrastructure based on TOPNs-CS Modelling", International Journal of Advanced Manufacturing Technology, UK, Vol.22, No.3-4, Jul 2003, pp 191-215.


  39. Jiang Z B, Fung R Y K, Zuo M J and TU P Y L, "Automatic Modelling of One-of-a-Kind Production Systems by TOPNs-CS", International Journal of Advanced Manufacturing Technology, UK, Vol.21, No.1, Jan 2003, pp 45-65.


  40. Tu, Y. L., Fung, R.Y.K., Tang J and Kam, J.J., "Computer Aided Customer Interface for Rapid Product Development", International Journal of Advanced Manufacturing Technology, UK, Vol.21, No.10-11, Oct 2003, pp 743-753.


  41. Fung, R.Y.K., Tang, J., Tu, P.Y. and Chen, Y., "Modelling of Quality Function Deployment Planning with Resource Allocation", Research in Engineering Design, USA, Vol.14, Sep 2003, pp 247-255.


  42. Fung, R.Y.K., Tang, J. and Wang D., "Multi-Product Aggregate Production Planning with Fuzzy Demands and Fuzzy Capacities", IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans, USA, Vol.33, No.3, Aug 2003, pp 302-313.


  43. Fung R Y K, Au A Y M and IP A W H, "Petri Net-based Workflow Management Systems for In-Process Control in a Plastic Processing Plant", Journal of Materials Processing Technology, UK, Vol.139, Mar 2003, pp 302-309.


  44. Xie, S.Q., Tu Y.L., Fung R.Y.K. and Zhou Z.D., "Rapid one-of-a-kind product development via the Internet: a literature review of the state-of-the-art and a proposed platform", International Journal of Production Research, UK, Vol.41, No.18, Nov 2003, pp 4257-4298.


  45. Fung R. Y. K., Au, Y.M., Jiang, Z.B. and Lau, H.C.W., "Supply Chain Workflow Modelling using Modular Petri Nets", International Journal of Advanced Manufacturing Technology, U.K., Vol.22, No.7-8, Jun 2003, pp 587-601.


  46. Tang J, Fung R Y K, Xu B and Wang D, "A New Approach to Quality Function Deployment Planning with Financial Consideration", Computers and Operations Research, UK, Vol.29, Sep 2002, pp 1447-1463.


  47. Fung R Y K, JIang Z B, Zuo M J and Tu P Y L, "Adaptive Production Scheduling of Virtual Production Systems Based on Object-Oriented Petri Nets with Changeable Structure Modeling", International Journal of Production Research, UK, Vol.40, No.8, Sep 2002, pp 1759-1785.


  48. Fung R Y K, Tang J and Wang D, "Extension of a Hybrid Genetic Algorithm for Nonlinear Programming Problems with Equality and Inequality Constraints", Computers and Operations Research, UK, Vol.29, No.3, Aug 2002, pp 261-274.


  49. Fung R Y K, Tang J, Tu Y L and Wang D, "Product Design Resources Optimisation Using a Non-Linear Fuzzy Quality Function Deployment Model", International Journal of Production Research, UK, Vol.40, No.3, Jul 2002, pp 585-599.


  50. Fung R Y K, Tam W T, Ip A W H and Lau H C W, "Software process improvement strategy for enterprise information systems development", International Journal of Information Technology and Management, UK, Vol.1, No.2/3, Jul 2002, pp 225-241.


  51. Fung R Y K, Ma X and Lau H C W, "(T,S) Policy for co-ordinated inventory replenishment systems under compound poisson demands", Production Planning and Control, UK, Vol.12, No.6, Sep 2001, pp 575-583.


  52. Fung R Y K and Ma X, "A new method for the joint replenishment problems in manufacturing", Journal of the Operational Research Society, UK, Vol.52, Aug 2001, pp 358-362.


  53. Harding J A, Popplewell K, Fung R Y K and Omar A R, "An intelligent information framework for market driven product design", Computers in Industry, UK, Vol.44, No.1, Jul 2001, pp 49-63.


  54. Jiang Z, Zuo M J, Fung R Y K and Tu P Y L, "Colored Petri Nets with Changeable Structures (CPN-CS) and their Applications in Modeling One-of-a-Kind Production (OKP) Systems", Computer & Industrial Engineering, USA, Elsevier Science, Vol.41, No.3, Dec 2001, pp 279-308.


  55. Tang J, Wang D and Fung R Y K, "Formulation for General Possibilistic Linear Programming Problems for Complex Industrial Systems", Fuzzy Sets and Systems, UK, Vol.119, No.1, Sep 2001, pp 41-48.


  56. Djordjevich A, Fung M and Fung R Y K, "Principles of Deflection-Curvature Measurement", Measurement Science and Technology, USA, Vol.12, Nov 2001, pp 1983-1989.


  57. Ma X, Fung R Y K and Xu C, "Stable Factorized Quasi-Newton Methods for Nonlinear Least Squares Problems", Journal of Computational and Applied Mathematics, UK, Vol.129, No.1-2, Jul 2001, pp 1-14.


  58. Wang D, Tang Z, Ip A and Fung R Y K, "A Human-Computer Interactive Approach-Based on Activity-Section Analysis for BPR", Production Planning and Control, UK, Vol.11, No.8, Dec 2000, pp 289-296.


  59. Ip W H, Kwong C K and Fung R Y K, "Design of Maintenance System in MRPII", Journal of Quality in Maintenance Engineering, Vol.6, No.3, 2000, pp 177-191.


  60. Tang J, Wang D and Fung R Y K, "Fuzzy Formulation for Multi-Product Aggregate Production Planning", Production Planning and Control, UK, Vol.11, No.7, Oct 2000, pp 670-676.


  61. Fung R Y K, Pereira A C and Yeung R W H, "Performance evaluation of a Web-based information system for laboratories and service centres", International Journal of Logistics Information Management, Vol.13, No.4, 2000, pp 218-227.


  62. Jiang Z B, Zuo M J, Fung R Y K and Tu P Y L, "Performance modeling of complex dynamic production systems using Temporized Object-Oriented Petri Nets with Changeable Structure (TOPNs-CS)", International Journal of Advanced Manufacturing Technology, Vol.16, No.7, 2000, pp 521-536.


  63. Jiang Z B, Zuo M J, Fung R Y K and Tu P Y L, "Temporized Colored Petri Nets with Changeable Structure (CPN-CS) for performance modeling of dynamic production systems", International Journal of Production Research, UK, Vol.38, No.8, May 2000, pp 1917-1945.


Last modified on 2 July, 2009