General view of the
climbform for the central
core construction
Core construction is ahead of
the wings contruction by 3 to 4
floor levels. Such an arrangement
can achive a smoother work
co-ordination for the core and
the construction of the 4 wings
The climbform arragement with
the upper and the lower working
platform, and with the blue
climb-rams
The climbform arragement with
the upper and the lower working
plateform, and with the blue
climb-rams
The support beams for the
working plateforms.
The climbform supporting pins are
inserted into the seating pockets.
The support beams for the
working platforms. The climbform
supporting pins are inserted into
the seating pockets.
The supporting frame for the
corewall formwork and
reinforcement fixing for the corewall.
The hydraulic jacks provide the
basic climbing energy for the
whole climbform
The control panel for monitoring the
pressure of the hydraulic jacks
The steel bender is fixing the
wall reinforcement
The formworkers are stripping
the wallform after the concrete
has cured and achieved the
required strength.
Wallform panels.
The supporting beam is across the
wall panels
The formworker is erecting the
formwork for the corewall
and corridor slab
The formworker is erecting the
formwork for the corewall
and corridor slab
The opening on the wallform is
convenient for the workers to
access between the external and
internal wallforms
The ties are linking the 2 faces of
wallform panels
The ties are linking the 2 faces
of wallform panels
The detail panel alignment for set
up and positioning of wallform
The detail panel alignment for set-
up and positioning of the wallform
The wallform accessories: tie-nuts,
tie rods connection
The wallform accessories:
tie-nuts, tie rods connection
The fixing clip is connecting
the waling beam and the
supporting beam for gaining
sufficient rigidity and
accurate alignment
Small wooden panels are fixed at
the base of climbform panels to
cover the gap between the wallform
panel and the reinforced concrete wall. The wooden
panels are used for preventing any
small objects or hand tools falling
from such gap.
The gap between the wallform panel
and the true reinforced concrete wall face is located
at the bottom of climbform with
potential danger of falling objects.